New Construction of Medical Office Building. Masterplan for multiple buildings and proposed parking deck. Fast tracked project completed in approximately 19 months.
Scope included a tech hub, specialized lighting, and building system upgrade to a data center and engineering shops
Renovation adjacent to pediatric ORs and PACU to integrate related services into one space. Goals achieved by tracking workflows of each group, identifying overlap points, and fostering collaboration through strategic adjacencies.
As the architects for this original building and campus we have done ongoing planning since the inception. This project is a retrofit of a Mezzanine into an existing gymnasium to create extra space without exterior addition. Upgrades to lighting, HVAC, and Plumbing.
"A full service excellent firm capable of handling any scope of project"
"Project schedules are considered to be critical and are respected and met by the firm"
"Construction Documents produced by IHR Architecture are always detailed and thorough"
"Their team has always been quick to respond and diligent with their design"
"From early design through construction administration and project closeout, IHR Architecture continues to be a great partner in delivering complex, fast tracked projects to a demanding client"
“Together we have formulated cost conscious approaches to meeting the end user requirements"
"Their team understands the importance of timely and quality responses to support the project construction schedule and budget"
Loading dock, compounding facility, blood cancer clinic, USP 797 and 800 pharmacy, sterile storage, shell space for ASC platform expansion, renovated sterility lab, clinical lab, offices, meditation room, and infusion therapy expansion.
Loading dock, compounding facility, blood cancer clinic, USP 797 and 800 pharmacy, sterile storage, shell space for ASC platform expansion, renovated sterility lab, clinical lab, offices, meditation room, and infusion therapy expansion.
Multi-Decade, multi-phased modernization of building. Repaired damaged brick by salvaging bricks from a no longer existing home that used the same batch of bricks from the original construction of St Mary’s.
21 room CEU expansion completed in two phases to allow uninterrupted operations during construction. Created separate staff and patient entrance routes, centralized nurse station, and decentralized charting stations
21 room CEU expansion completed in two phases to allow uninterrupted operations during construction. Created separate staff and patient entrance routes, centralized nurse station, and decentralized charting stations
Building addition to existing Medical Office Building consisting of a Linear Accelerator vault, Support Space, and extension of the front concourse to connect to the future masterplan building to the east.
Historical Preservation of Facade and modernized shell structure.
Historical Preservation of Facade and modernized shell structure.
Total renovation of existing MRI control, imaging, and equipment component rooms as well as replacement of RF Shield.
Following our design of the hospital addition, a multi-phased upfit and renovation project included the creation of waiting room and reception area and the renovation for CT, SPECT CT, injection bays, treadmill room, hot lab, staff workroom, patient gowned subwait, and patient toilet.